2010-2014
High Speed Rail Coordination
Feasibility 540m Tunnel Concept Foxground to Berry Upgrade
Cable stay bridge Concept Fern Street Gerringong
Oallen ford bridge replacement, Nerriga
100Ml Earth Reservoir Gunning
M4 Colyton , Roper Street Slipway M4
Subdivision Certification Thirroul
Subdivision Coastal Waters Nowra
Development Wrights Beach, Nowra
Syrkosky Helicopter Maintenance and Logistics Nowra
Belconnen Cantilever prestressed Bridge claim
Alford Point North Bridge, Falsework
Mt Pleasnnt - Gerringong upgrade Formwork , Concrete, Reinforcemnt, Earthwork
Central tilba Upgrade RMS
Brown Creek Bridge , Cambewarra, Design and construction
Falls Creek Bridge, Nowra
Kiama Development 13 town houses , feasibility on completion.
Maldon to Dombarton Railway Professional bid for estimation to complete.
Mt Agony Bridge Design and construct.
Kiama Flood Study Farmer Street
2008-2010
Civil & Structural, Project Management in Construction,
Gunghalin Drive extension, ACT
Camden Valley Way Upgrade Cobbity to Narrellan Road
Landslip area for Urban Subdivisions
Earthworks for large development , Yagoona
Construction Estimate for Mixed use development , Gerringong
Civil and Structural Design
Structure Design Mixed use development , Gerringong
Earthworks and Shoring for large car park , Gerringong
Large Residence, Structural Alterations , Haberfield
1998 - 2008
Civil & Structural, Project Management in Construction,
Costing and planning of Tharwa Bridge ACT.
Antiene – Grasstree, Muswellbrook ARTC Freight Rail Upgrade
Muswellbrook ARTC Rail Bridges Upgrade
ACTEW Reservoirs ,Design and construct. ACT
Hoxton Park Road upgrade RTA
Mt. Conjola Princess Hwy realignment and viaduct
Costing and planning of M5 Moorebank Interchange.
Bowral Reservoir and rising main ,Design and construct .
Prospect Reservoir pump station and off take works including
sheet piling and construction methods.
Winston Hills Subdivision , Remediation, Earthworks , Roadworks
Civil and Structural Design
Landslip area for Urban Subdivisions, Winston hills
Large Earthworks Remediation design Scheme 2.
Ulludulla Fishermans Coopt Alterations
Shell Cyclone regeneration , support structure.
Mt. Conjola Princess Hwy viaduct falsework design
Alfords Point RTA Bridge over Henry Lawson Drive Falsework
Report on Construction Feasibility for Coastal Hazards , North
Entrance
Preliminary Report on Ventilation / Condensation, Visy,
Smithfield
Large Earthworks Remediation design Scheme 1
Design Roadworks , Sewer Stormwater and water and services
Stormwater Concepts Flood Analysis and Design
Geotechnical Assistance in remediation investigation
Design of Bridge Mcley River Wagga, inclusive Proof Engineering
Pavement Design Developments , and adjoining public access roads
Large Residences, Dual Occupancies, Medium Density, Multi storey
Residential structures Industrial Developments,
Design plan and call tenders for basement under existing building
Structural Adequacy, Certifiucation Reports
Foundation Methods,Various Corporate and Private developments,
Reinforcements inspections, Formwork adequacies, Excavations
Shoring
Railway Infrustructure Coorporation, Workshop Improvements
1982 - 1997
Civil & Structural, Project Management in Construction,
Project costing and planning of various infrastructure
including railway, Bridges, Roads, tunnels and freeways, water
sewer. Main Railway line ,underpass,Jacked in place structures.
The Eastern Distributor & M5 East , Sydney, Tunnel and approach
works.
Bayswater Power Station inclusive of coal mine
development and Ash Dam at Pikes Gulley, F3 Freeway,
F5 Freeway,Numerous Bridges and structures,Darling
Harbour Development,also Collieries ,concrete slipformed
pavements ,Water and Sewerage Treatment Plants,underpasses, F4
freeway,Transmission Lines.
Writing of and supervising implementation of quality manual &
Procedures to AS/NZS ISO 9001-1994 for Civil Engineering Works.
Microtunnelling and Directional drilling, The Southern Railway, The
M5 East.
Civil and Structural Design
Concept for strategic road development , MR 92.
Contract Administration , Dispute Resolutions and Finalisations.
As Engineers and Designers, responsible for Feasibilities
Investigating and Reporting and Design and Supervision of
civil and structural private projects inclusive of
Bridge Falsework Design,Culvert upgradings to railway
lines,Investigation to failed driven steel casings bridge
piles. Commercial ,industrial and residential.Fault analysis
and reports.
Fabrication and shop drawings Batemans Bay Highs School
Steel Arch Bridge Railway , Coffs Harbour.
Fast Train Route Study, Flood Study of Urban Catchment, Foundation
Methods, Various Corporate and Private developments, Civil &
Structural ,
Appearances as expert witness in Land and Environment .
1973 - 1981
Managing Director, involved with all facets of construction:
Marketing, Public Relations, Submissions
Financial arrangements with suppliers and clients,
Project Management, Methods , Cost monitoring and
coding, Tendering, Variations, and Finalisations. Construction
included large Reinforced and Prestressed Concrete Works and
Bridges, Slipforming of Structures including tanks and
Alternatives, Public Works.
Design and Project Management of Industrial
Warehouse Complex.
Investigation Design and Project Management of
Residential Subdivision.
Design and Project Management of Abattoirs extensions including waste